![background image](/i/eaton/89519/eaton-ex-1000-rt2u-68182/h/eaton-ex-1000-rt2u-68182-012.png)
34008097EN/AE - Page 10
2. Installation
2.2 Installation of the RT model in tower position
2.3 Installation of the RT model in a rack
It is advised to install the battery EXB module(s) at the lowest position in the rack, then install the UPS above.
Follow steps 1 to 4 for module mounting on the rails.
The rails and necessary hardware
(37)
are supplied by EATON.
3
2
4
2
4
1
1
1
1
34008097EN_AE.fm Page 10 Mardi, 2. décembre 2008 10:09 10