Инструкция для DE DIETRICH ZENA PLUS MSL 31 FF

(скачивание инструкции бесплатно)
Формат файла: PDF
Доступность: Бесплатно как и все руководства на сайте. Без регистрации и SMS.
Дополнительно: Чтение инструкции онлайн
background image

75

71.03982.03 - EN

INSTALLATION INSTRUCTIONS

13. INSTALLAZIONE DELLA CALDAIA 

14. INSTALLING THE BOILER 

After deciding the exact location of the boiler, make sure there is suficient room to perform maintenance operations (at 
least 450 mm of headroom is required in order to replace the expansion vessel).
Connect the system to the gas and water inlets present on the lower bar of the template. Fit two G3/4 taps (low and 
return) on the central heating circuit; these taps make it possible to carry out important operations on the system without 
draining it completely. If you are either installing the boiler on an existing system or replacing one, as well as the above, 
it a settling tank under the boiler on the system return line in order to collect any deposits and scale circulating in the 
system after lushing. After ixing the boiler to the template, connect the lue and air ducts, supplied as accessories, as 
described in the following sections.
If the model 

24 MI - 24

 natural draught boiler is installed, connected it to the lue with a metal pipe resistant to normal 

mechanical stress, heat, products of combustion and relative condensate.

IMPORTANT

After illing the boiler, vent the entire internal circuit and the system as follows:

•  close the gas on-off valve;
•   power the boiler.
•   open the vent valve on the pump body;
•   press (

) to set the boiler in the “WINTER” operating mode;

•   send a heat demand from the room thermostat;
•   open a hot water tap to alternate CH demand with DHW demand;
•   after a few ignition attempts the boiler will shut down (error E01 appears on the display);
•   to rest, press and hold down “

R

” for at least 2 seconds;

•   repeat the procedure at least another two times;
•   close the vent valve.

After venting the boiler circuit, proceed with initial lighting.

EXPANSION VESSEL

The boiler features a standard 6-litre expansion vessel with a pre-charge pressure of 1 bar. The maximum volume of water in 
the system is calculated according to hydrostatic pressure at an average water temperature of 80°C (low: 95°C return: 75°C).

Hydrostatic pressure (m)

5

6

7

8

9

10

Maximum system volume (l)

110

105

95

85

77

70

 

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332