![background image](/i/zyxel/148487/zyxel-ies-6000/h/zyxel-ies-6000-031.png)
Chapter 2 Hardware Installation and Connections
IES-6000M User’s Guide
31
2.3 Card Installation
This section shows you how to install and remove line cards.
• Install management switch cards in slot 8 and/or 9 on the IES-6000. You can use either
slot if there is only one management switch card.
• Install the line cards in the IES-6000 in the other slots.
• Leave the slot covers on unused slots.
2.3.1 Installing MSC and Line Cards
Use the following procedure to install management switch cards and line cards in the main
chassis.
1
Grasp the center of the front panel of the card with one hand and place the other hand
under the card to support it.
2
Insert the card halfway into the slot and spread the two ejector levers outward. Make
sure the ejector levers are perpendicular to the front panel.
3
Slide the card into the slot until it makes contact with the backplane. The ejector levers
should be at a small angle to the front panel now.
4
Push the two ejector levers firmly until they are flush with the front panel.
5
Tighten the two thumbscrews.
Figure 8
Installing a Card